Construction of HPP cascade on the river Zhupanova

Purpose: Comprehensive development of Kamchatka Territory by using renewable clean energy of river; a significant reduction in the cost of electricity production and selling tariffs for consumers, which, in turn, will give impetus to the development of the regional economy.

BRIEF DESCRIPTION

Initiator

KGBU "Regional Centre for Development and Energy Efficiency"

Business-idea (the purpose)

Integrated development of Kamchatka Territory by using renewable clean energy and tidal rivers; a significant reduction in the cost of electricity production and selling tariffs for consumers, which, in turn, will give impetus to the development of the regional economy.

Territory of business

Place construction of cascade hydropower Zhupanovsky - Zhupanova river, south of the Kamchatka Peninsula. Distance from Petropavlovsk - Kamchatka - 100 km. The river originates on the eastern slopes of the ridge Yelagin and empties into the Gulf Kronotskiy Pacific. The river is 242 km. The catchment area of ​​6980 square meters. km.
The climate of this region is moderately cold, the average annual temperature +3,0 ° C. Terrain is characterized by heavy rainfall and winds. Significant winter snow cover 1-1.5 meters.

Investments

Total project cost - 89 900 mln., Including:
Zhupanovsky HPP-1 - 48 800 mln.;
Zhupanovsky HPP-2 - 20 800 mln.;
Zhupanovsky HPP-3 - 20 300 million rubles.

Period of realization

2013-2020.

Main stages of the project life cycle of building HPP cascade on the river. Zhupanova:
- Conceptual (pre-) phase (8 months);
- Pre-investment (project) phase (2.5 years);
- Investment (construction) phase (14.5 years).

Type of project

Greenfield

Industry classification

Electric power and electricity.

Planned production (production capacity)

Project plan includes the construction of 3- HPP:
Zhupanovsky HPP - 1 - 122 m height, flooded area - 13.6 thousand ha, firm capacity - 11 MW installed capacity -270 MW and annual electricity -1300 million kWh ;
Zhupanovsky HPP - 2 - 99 m height, flooded area - 2.45 hectares , firm capacity - 34 MW installed capacity -90 MW and annual electricity generation -474 million kW / h ;
Zhupanovsky HPP - 3 - 83 m height, firm capacity - 23 MW installed capacity - 55 MW and annual electricity generation -275 million kW / h
Power output of HPP - 1 is planned for 220 kV 140 km . In the course of development of the cascade hydropower total length of 220 kV transmission lines will be 310 km . Thus, a ring for reliability of electricity supply and the central power Kamchatka preconditions for development of the mining industry and in Milkovsky Bystrinskiy areas.
Construction of roads :
Petropavlovsk-Kamchatsky - Zhupanovsky HPP- 3 131 km;
Zhupanovsky HPP - 1 - Zhupanovsky HPP-2 -71 km;
Zhupanovsky HPP - 2 - Zhupanovsky HPP -3 -34 km;
Overall length - 236 km. Priority - 161 km .

Socio-economic indicators of the project

Implementation of this project will provide an opportunity to completely replace the electric power generation based on fossil fuel burning CHP-1, CHP-2. Freeze tariffs at the time of start-HPP translate Petropavlovsk-Kamchatsky to electric heating.

   

STATUS

Availability of business plan, feasibility studies, financial models

In 2013, specialists design and survey institute "Lengidroproekt" (branch of JSC "RusHydro") made ​​"Declaration of Intent" (DON), which includes elements of the feasibility study, business plan and EAs.

Availability of design, permits, necessary examinations (public, environmental, etc.) 

DON is in the ministries and organizations of the region and, in the case of a positive decision will be forwarded to the Administration Elizovo district to the Interdepartmental Commission, Kamchatka.
Term development stage of the project - in 2015.

Availability of land plot

Yes