BRIEF DESCRIPTION |
|
Initiator |
KGBU "Regional Centre for Development and Energy Efficiency" |
Business-idea (the purpose) |
Integrated development of Kamchatka Territory by using renewable clean energy and tidal rivers; a significant reduction in the cost of electricity production and selling tariffs for consumers, which, in turn, will give impetus to the development of the regional economy. |
Territory of business |
Place construction of cascade hydropower Zhupanovsky - Zhupanova river, south of the Kamchatka Peninsula. Distance from Petropavlovsk - Kamchatka - 100 km. The river originates on the eastern slopes of the ridge Yelagin and empties into the Gulf Kronotskiy Pacific. The river is 242 km. The catchment area of 6980 square meters. km. |
Investments |
Total project cost - 89 900 mln., Including: |
Period of realization |
2013-2020. Main stages of the project life cycle of building HPP cascade on the river. Zhupanova: |
Type of project |
Greenfield |
Industry classification |
Electric power and electricity. |
Planned production (production capacity) |
Project plan includes the construction of 3- HPP: |
Socio-economic indicators of the project |
Implementation of this project will provide an opportunity to completely replace the electric power generation based on fossil fuel burning CHP-1, CHP-2. Freeze tariffs at the time of start-HPP translate Petropavlovsk-Kamchatsky to electric heating. |
STATUS |
|
Availability of business plan, feasibility studies, financial models |
In 2013, specialists design and survey institute "Lengidroproekt" (branch of JSC "RusHydro") made "Declaration of Intent" (DON), which includes elements of the feasibility study, business plan and EAs. |
Availability of design, permits, necessary examinations (public, environmental, etc.) |
DON is in the ministries and organizations of the region and, in the case of a positive decision will be forwarded to the Administration Elizovo district to the Interdepartmental Commission, Kamchatka. |
Availability of land plot |
Yes |