Construction of a Mountain-metallurgical complex for extraction and processing of gold ore deposit "Ozernovskoye"

Aim of the project: to built a pilot production in mining and processing of gold ore in the territory of the licensed area with an annual capacity of 250 thousand tons / year. Implementation of the project will require the construction of mining and processing plant, mining enterprises, facilities and infrastructure, including p.Tilichiki up the road from the field "Violet."

BRIEF DESCRIPTION

Initiator

JSC "SIGMA branch Petropavlovsk-Kamchatsky."

Business-idea (the purpose)

On the territory of the license area is planned to build a pilot production in mining and processing of gold ore with an annual capacity of 250 thousand tons / year. Implementation of the project will require the construction of mining and processing plant, mining enterprises, facilities and infrastructure, including p.Tilichiki up the road from the field "Violet."

Territory of business

Ozernovo ore field is located on the territory of the Koryak Autonomous Okrug Kamchatka Territory , 145 km from the town of Keys and 520 km from Petropavlovsk -Kamchatsky, covers an area of ​​about 100 km2. Gold- linear saturation metasomatic has no analogues in the Kamchatka region . The license area is 48.5 km2 and covers the eastern part of the most studied Ozernovo ore field within which identified five major areas : BAM , clamp , Intermediate , Kayurkovsky and Prometheus .

At the time of obtaining a license (2005) within the ore field identified 60 mineralized zones and veins, which are concentrated in the range of promising areas - BAM , clamp , Intermediate , Kayurkovsky and Prometheus . In the most studied part of the License Area - BAM zone were counted gold ore reserves of C2 category in quantity : 980 tons of ore , gold 16024 kg, 7.2 t of silver at an average gold grade of 16.6 g / t silver and 7.0 g / ton In accordance with the protocol number 109 dated 23.02.1993 , the meeting of the section of solid minerals CDC " Roskomnedra " when the reserves were taken into account on the balance sheet in the industry . Inferred resources Ozernovo ore field on 01.01.2003 were taken in the following amounts : P1 - 44066 kg of gold , silver - 42.7 m ; P2 - 20 167 kg of gold , silver - 18.4 m

Investments

Project cost: 12,440 million rubles.

Own funds:

9240 million rubles. (1,800 million rubles. - Invested).

Borrowings: 3200 million rubles. (search).

Phase 1, commissioning 2015: 5,000 million rubles.

Period of realization

2013-2017

Type of project

Greenfield

Industry classification

Mining and metallurgical industry.

Planned production (production capacity)

The average annual capacity of up to 4 tons per year with average grade of gold/ore: 16 g/ton.

Socio-economic indicators of the project

The project will create new jobs (approximately 100 new jobs), to create the infrastructure, including driveways.

STATUS

Availability of business plan, feasibility studies, financial models

Planned activities on 5 areas of the field. For 2 sections  business plans developed.

Availability of design, permits, necessary examinations (public, environmental, etc.) 

Project documentation (technical design)

Availability of land plot

Yes