BRIEF DESCRIPTION |
|
Initiator |
JSC "SIGMA branch Petropavlovsk-Kamchatsky." |
Business-idea (the purpose) |
On the territory of the license area is planned to build a pilot production in mining and processing of gold ore with an annual capacity of 250 thousand tons / year. Implementation of the project will require the construction of mining and processing plant, mining enterprises, facilities and infrastructure, including p.Tilichiki up the road from the field "Violet." |
Territory of business |
Ozernovo ore field is located on the territory of the Koryak Autonomous Okrug Kamchatka Territory , 145 km from the town of Keys and 520 km from Petropavlovsk -Kamchatsky, covers an area of about 100 km2. Gold- linear saturation metasomatic has no analogues in the Kamchatka region . The license area is 48.5 km2 and covers the eastern part of the most studied Ozernovo ore field within which identified five major areas : BAM , clamp , Intermediate , Kayurkovsky and Prometheus . At the time of obtaining a license (2005) within the ore field identified 60 mineralized zones and veins, which are concentrated in the range of promising areas - BAM , clamp , Intermediate , Kayurkovsky and Prometheus . In the most studied part of the License Area - BAM zone were counted gold ore reserves of C2 category in quantity : 980 tons of ore , gold 16024 kg, 7.2 t of silver at an average gold grade of 16.6 g / t silver and 7.0 g / ton In accordance with the protocol number 109 dated 23.02.1993 , the meeting of the section of solid minerals CDC " Roskomnedra " when the reserves were taken into account on the balance sheet in the industry . Inferred resources Ozernovo ore field on 01.01.2003 were taken in the following amounts : P1 - 44066 kg of gold , silver - 42.7 m ; P2 - 20 167 kg of gold , silver - 18.4 m |
Investments |
Project cost: 12,440 million rubles. Own funds: 9240 million rubles. (1,800 million rubles. - Invested). Borrowings: 3200 million rubles. (search). Phase 1, commissioning 2015: 5,000 million rubles. |
Period of realization |
2013-2017 |
Type of project |
Greenfield |
Industry classification |
Mining and metallurgical industry. |
Planned production (production capacity) |
The average annual capacity of up to 4 tons per year with average grade of gold/ore: 16 g/ton. |
Socio-economic indicators of the project |
The project will create new jobs (approximately 100 new jobs), to create the infrastructure, including driveways. |
STATUS |
|
Availability of business plan, feasibility studies, financial models |
Planned activities on 5 areas of the field. For 2 sections business plans developed. |
Availability of design, permits, necessary examinations (public, environmental, etc.) |
Project documentation (technical design) |
Availability of land plot |
Yes |