Silver natural drinking water in the bay of Kamchatka "Russkaya"

Organization of 3 million tons per year production and sale of clean drinking water from underground mineral waters on the deposit of “Russkaya” bay.

Total reserves  of underground waters in “Russkaya” bay estimated more than 100 thousand cubic meters per day. The field is located in the bay on the east coast of Russian Kamchatka peninsula, 90 km to the south of the port of Petropavlovsk-Kamchatsky. Territory of water intake is located within the South-Kamchatsky nature park, far away from settlements and industrial facilities. The uniqueness of the object is due to the high performance of underground mineral water of drinking quality, high flow rate, the ability to load large-capacity tankers directly from the field. Russian depth of the bay up to 26 meters on the fairway that allows to boot water-filled vessels up to 100 thousand tons.

                                                              Description of the project

Project proponent

OOO “ Russkaya Voda”

683000, Russia, Kamchatsky krai, Petropavlovsk - Kamchatsky,  Lenin str, 38, office 214 |

+7 (415-2) 423-591

E-Mail This email address is being protected from spambots. You need JavaScript enabled to view it.

Gorbunov Alexander Evgenievich – General Director

Website:  http://aquarus.ru

Business idea (aim)

Construction of the pier, production and sales of clean drinking water from underground fresh waters of “Russkaya” bay in amount of  million tons per year by the water-filled vessels.

Brief description of the territory where the project will be realized

The field is located in the bottom of the bay on the eastern Russian coast of the Kamchatka Peninsula , 100 km south of the port of Petropavlovsk - Kamchatsky . Territory of water intake located within the South - Kamchatka Nature Park , away from populated areas and industrial facilities. The uniqueness of the field due to the high performance of underground fresh water of drinking quality , the ability to download large-capacity tankers directly from the field. Russian bay depth, up to 26 m on the fairway, allow loading of water-filled vessels of up to 100,000 tons.

Estimated investments in the project

Total investments – 1 414 065 000 Rubles, including:

476,526,000. Rub. - Construction of water main domestic and drinking purposes in the Bay "Russkaya", including the acquisition of the service equipment;

763,459,000. Rubles - Design and construction of the pier;

24,080,000. Rubles - The acquisition of the service equipment;

150.0 million Rubles- contingencies.

Project implementation period, stages

Period of project implementation – 3 years

The project consists of two stages.

1st place: additional exploration, construction of wells and the construction of the pipeline, the construction of the pier, the implementation of underground fresh water water-filled vessels with a displacement of 100 tons.

2nd stage: the construction of a plant for water bottling plant with a capacity of 35 million bottles per year.

Payback period

2 years 9 month

Type of project

New construction

Industry classification

Mineral resources complex. Geological study with concurrent and subsequent extraction of drinking water.

Planned production (capacity)

Production and sales of clean drinking water from underground fresh waters of “Russkaya”  bay in the amount of 3 million tons per year:

-Water-filled vessels with a displacement of up to 100 thousand tons;

-Bottled over 35 million bottles per year.

Mechanisms for implementation of the project

Private funds

Possible interest rate subsidies on loans obtained in Russian credit organizations, aimed at the implementation of the project.

It is necessary to consider the possibility of raising funds of JSC “ Development Fund of Far east and the Baikal region”

Socio-economic significance of the project (number of jobs created)

Creation of 44 new jobs

Providing the population with an environmentally friendly product.

Availability of business plan, feasibility study, financial model

Developed business plan ( in prices of 2012)

In 2014, designed and estimated documentation for the water intake and water pipeline capacity of 10,000 cubic meters per day OOO “Kamchatagropromproekt”.

Project has passed environmental review.

The presence of the project, permits, necessary examinations (public, environmental, and so on.) - readiness / expected time frame for obtaining

Obtained a license for a 25-year period for geological research.

Drafted the project on geological exploration of fields. Developing the project of pier construction. Obtained the analysis of water, which corresponding to SanPin 2.1. 41074-01 “Drinking water” and international standards. The presence of silver ions gives to water medical properties and allows not to deteriorate for a long time, while retaining its quality.

Deposit protection passed by the State Committee for the Protection of deposits of the Ministry of Natural Resources of the Russian Federation.

Availability of land

Completed lease agreement on 49 year for works on construction of water pipelines from the water intake and loading terminal.

Additional information

Total reserves of underground fresh water deposit in “Russkaya” Bay is estimated at more than 100 thousand cubic meters per day. The deposit is located in the bay on the east coast of Russian Kamchatka peninsula, 90 km southern from the port of Petropavlovsk-Kamchatsky. Territory intake in the range of South-Kamchatsky Park, far away from settlements and industrial facilities. The uniqueness of the object due to the high performance of underground fresh water of drinking quality, high flow rate, with ability to load large-capacity tankers directly from the field. Depth of “Russkaya” bay is up to 26 meters in the fairway, which allow loading of water-filled vessel up to 100 thousand tons.